Construction Project Management Software in Morocco
Drawings, contractor valuations, change orders and drones — one platform for all your projects, public and private alike.
Why do Maroccan construction projects derail without a control system?
Most sites are still run on paper, scattered email and phone calls: schedules in Excel, requests buried in chat, and the PV de réception or situation mensuelle nowhere to be found the day a dispute arises. The usual results: late handovers, disputes over quantities and responsibility, and a margin eaten by coordination.
The system runs on clear roles — owner, project manager, design office, contractor — each with its own permissions, and every decision backed by a document: bon de commande, RFI, meeting minutes, or change order.
From study to handover: the project cycle in a Moroccan context
- Study and award: manage tender calls, specifications and award files, from call for bids to contract signature.
- Execution: scheduling, tasks, quantities, site daily logs and meeting minutes for every team.
- Finance: situation, invoices, retenue de garantie and décompte provisoire / définitif — with a full audit trail.
- Handover: PV de réception, guarantees and per-project document archive, retrievable instantly.
These are not isolated modules; one lifecycle connects every stage, so what is recorded at execution shows up automatically in accounting.
Features built around your site realities
Pricing in dirhams — full transparency
Pricing based on the service delivered, not on headcount — because the value of a coordination tool lives across the whole team.
Frequently asked questions about construction management in Morocco
How do I manage a construction project budget in Morocco?
Centralize all costs in one flow: change orders, contractor valuations, invoices and reports, with live budget-vs-actual comparison and early overrun alerts.
What is the difference between an RFI and a change order?
An RFI is a formal request for information about drawings or execution before work; a change order modifies scope, schedule or price after award. Both are tracked with their supporting document.
Who leads a construction project in Morocco?
Typically: the owner (maître d'ouvrage), the design office / project manager (BET), then the contractor with a site manager (conducteur de travaux). The platform brings meeting minutes and decisions together for all parties.
How do I track contractor invoices?
Drop the paper trail: approve the monthly valuation, compare it against quantities, convert it into a payment order, with full tracking of the retention guarantee (retenue de garantie) and checks.
How much does construction management software cost?
Free trial (30 days, 1 project, 3 users). Pro at 3,500 MAD/month for the whole company with unlimited users, all modules included. Setup and training: 800 MAD one-off.
How do I track construction progress?
Site daily logs, geolocated photos, drone flights and orthophotos — all on one map alongside the project schedule.
What happens when the budget is exceeded?
Immediate alert with a budget-vs-actual variance report, a change-order register, and a full report you can present to the board or the financing partner.
Does the platform work with contractors in Casablanca?
Yes — the platform is bilingual (Arabic/French) and designed for the Moroccan context: public and private contracts, major cities, and remote account management for every team.